Home / Permits and utilities

Paperwork · November 25, 2026

Permits, notices, and your utility

“No interconnection agreement” is not the same sentence as “no one to tell.” The statutes in our file split on this, and several of the details below are from published summaries. Confirm them in the bill before you skip a form.

Ask these questions, in this order

  1. Is there a plug-in exemption in my state, and is it in effect today? Start with your state page.
  2. Does the statute require notice, registration, or a waiting period? Virginia’s summaries describe an SCC notice and a utility review window. California’s summaries describe online registration starting in 2027. Utah’s summaries say the utility cannot require approval.
  3. What listing does the device need? Several laws point at a nationally recognized testing lab. Vermont’s summaries name UL 3700. Do not assume a panel listing is the same thing as a plug-in system listing.
  4. Does the city or the utility still want a permit for the mount, the outlet, or a historic facade, even if the generator itself is exempt?
  5. If you do not own the building, does the lease allow it? That question is not the utility’s. See renters.

If the state has no exemption

Treat a backfeeding plug as customer generation. The usual path is the utility’s interconnection tariff, which can mean an application, a fee, and a disconnect. Some utilities have never written a rule for a 400-watt plug. Their silence is not approval. Ask, and keep the answer.

Verify with your utility. This page is general information, not a permit, and not legal advice. Last updated November 25, 2026.

Related: safety · how the hardware works.